ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Condition Moni, Kalpakkam - Tender Details
Explore tender information for Construction Of Condition Moni in Kalpakkam, including eligibility, deadlines, and bid specifics.
INDIRA GANDHI CENTRE FOR ATOMIC RESEARCH
Kalpakkam, Tamil Nadu, India
NTID 38939463
- Opening Date : Thu 30th January, 2025
- Closing Date : Wed 29th January, 2025
- ₹ 7441000.00
- NTID 38939463
Construction Of Condition Monitoring Lab First Floor And Staircase In Igcar At Kalpakkam.
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
148820.00 -
Document Cost
Refer Documents -
Estimated Cost
7441000.00
BOQ Items Total Items : 104 | Total Qty : 7573.7
# | Item | Quantity | Units |
---|---|---|---|
1 | Area cleaning in and around the site by cleaning the bushes, debris, fallen trees, waste materials, garbage's etc., collecting, conveying and disposing the same at places as shown by the department with a lead of 100 metres all complete as per specification and as directed by the Engineer-in-charge. | 180 | Sq.m. |
2 | Conveying the surplus excavated earth, broken materials, debris, boulders and spoil by mechanical means and depositing at places inside DAE installation identified as Dumping yard as per requirement with a lead specified below including loading, unloading, breaking clods, levelling all complete as per specification and as directed by the Engineer-in-Charge. Note: 1) The rates in respect of this Item are applicable for the NET Quantities arrived at after making deductions for voids @ 20% in respect of soil, @ 30% in respect of debris and @ 50% in respect of Rock from the corresponding Stack / Truck measurements. 2) The earth shall be dumped well inside the Dumping yard and not over approach pathway road. | ||
3 | Lead charges for lead Exceeding 3 kilometre but not exceeding 4 kilometre | 30 | Cu.m. |
4 | Earthwork excavation by mechanical means (Hydraulic excavator) or manual means for foundation, substructures, plinth beam, cess pits & trenches, all kinds of foundation etc., in all types of soil like hard gravelly soil, sandy soil for the following depth from average ground level upto the required founding level, line and grades in both dry and wet conditions including shoring, strutting, bailing out of water if necessary, levelling and ramming the bottom of trenches, dressing of sides, stacking the excavated materials away from the edge of trenches, refilling the sides of foundation as required with selected excavated earth and depositing / disposing the surplus excavated earth (Disposed soil to be leveled by breaking clods, if any and neatly dressed and leveled) within the lead specified below all complete as per specifications and as directed by the Engineer-in-charge. | ||
5 | All kinds of soil with depth upto 1.5m below average Ground level and disposing surplus excavated earth upto a lead of 50 metres. | 280 | Cu.m. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054