ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Concrete Bed A, Madhavaram - Tender Details
Explore tender information for Construction Of Concrete Bed A in Madhavaram, including eligibility, deadlines, and bid specifics.
Tamilnadu Co-op Milk Producers Federation Ltd.
Madhavaram, Tamil Nadu, India
NTID 38870739
- Opening Date : Tue 21st January, 2025
- Closing Date : Mon 20th January, 2025
- ₹ 497000.00
- NTID 38870739
Construction Of Concrete Bed And Roofing Arrangement For New 1010 Kva Generator At Central Dairy
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
5000.00 -
Document Cost
Refer Documents -
Estimated Cost
497000.00
BOQ Items Total Items : 12 | Total Qty : 694.6
# | Item | Quantity | Units |
---|---|---|---|
1 | EARTHWORK EXCAVATION for all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc., complete complying with standard specifications. (0 - 2.00 m) | 39.000 | CUM |
2 | Plain Cement Concrete 1:5:10 (One Cement, five sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 3.500 | CUM |
3 | Reinforced Cement Concrete 1:2:4 (One Cement,two sand and four hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | ||
4 | Upto Basement | 21.000 | CUM |
5 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 5.100 | QTL |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054