ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Community Hall, Chennai - Tender Details
Explore tender information for Construction Of Community Hall in Chennai, including eligibility, deadlines, and bid specifics.
Tamil Nadu Urban Habitat Development Board
Chennai, Tamil Nadu, India
NTID 39170586
- Opening Date : Tue 18th February, 2025
- Closing Date : Mon 17th February, 2025
- ₹ 18450000.00
- NTID 39170586
Construction Of Community Hall At Sathiyavani Muthu Nagar Scheme In Greater Chennai Corporation Division No. 75, Zone Vi Under Iyothee Thass Pandithar Fund For The Year 2024 To 2025
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
105000.00 -
Document Cost
Refer Documents -
Estimated Cost
18450000.00
BOQ Items Total Items : 96 | Total Qty : 11683.79
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work excavation for foundation with all leads and lifts in all soils and subsoil s to the required depth as may be directed except hard rock requiring blasting inclusive of shoring strutting and bailing out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15 cm thickness well consolidated depositing the surplus earth in places shown and leveling the site with all initial leads and lifts etc complete complying with relevant standard specification etc complete in all respects as directed by departmental officers. | ||
2 | With Initial lead of 10m and Initial Lift of 2m | 651.00 | 1 M3 (One Cubic Metre) |
3 | With Initial lead of 10m and additional Lift of 1m | 141.00 | 1 M3 (One Cubic Metre) |
4 | Filing in foundation and basement with M-Sand in layers not exceeding 15 cms thick well watered rammed and consolidated complying with relevant standard specification including the cost of Supplying M-Sand etc., complete in all respects as directed by the departmental officers. | 31.00 | 1 M3 (One Cubic Metre) |
5 | Filling in foundation and basement with Quarry dust in layers not exceeding 15 cm thick well watered rammed and consolidated complying with relevant standard specification including the cost of supplying Quarry dust etc., complete in a respects as directed by the departmental officers | 227.00 | 1 M3 (One Cubic Metre) |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054