ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Classroom At S, Muzaffarnagar - Tender Details
Explore tender information for Construction Of Classroom At S in Muzaffarnagar, including eligibility, deadlines, and bid specifics.
Uttar Pradesh Projects Corporation Limited
Muzaffarnagar, Uttar Pradesh, India
NTID 38757641
- Opening Date : Sat 4th January, 2025
- Closing Date : Sat 4th January, 2025
- ₹ 1097293.00
- NTID 38757641
Construction Of Classroom At Sanatan Dharm Inter College Meerapur, Distt.-muzaffarnagar U.p.
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
26000.00 -
Document Cost
5900.00 -
Estimated Cost
1097293.00
BOQ Items Total Items : 38 | Total Qty : 1424.18
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge(all kind of soil) | 45.49 | CUM |
2 | Filling of carted earth in plinth including supply of necessary quantity of earth from a distance not exceeding 8km from the side of work and including watering dressing etc. required for proper completion of work.(lead up to 30m & lift 1.5m) | 28.87 | CUM |
3 | Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/Ordinary Portland /Portland Slag cemnt, admixture recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete | 9.68 | CUM |
4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 17.64 | CUM |
5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.78 | CUM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054