ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Chief Minister, Tiruvannamalai - Tender Details
Explore tender information for Construction Of Chief Minister in Tiruvannamalai, including eligibility, deadlines, and bid specifics.
Sports Development Authority Of Tamil Nadu
Tiruvannamalai, Tamil Nadu, India
NTID 39104530
- Opening Date : Wed 26th February, 2025
- Closing Date : Tue 25th February, 2025
- ₹ 0.00
- NTID 39104530
Construction Of Chief Ministers Mini Stadium At Kilpennathur Assembly Constituency In Tiruvannamalai District
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
153000.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 178 | Total Qty : 77361.75
# | Item | Quantity | Units |
---|---|---|---|
1 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15cm deep and disposal of rubbish, lead upto 50m and lift upto 1.5m. (All kinds of soil) | 33975.00 | Sqm |
2 | Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification. | 4259.00 | Cu.m |
3 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 2415.25 | Cu.m |
4 | Same as above item no. 01. but, depth above 2.00mts. but not exceeding 3.00mts. | 10.00 | Cu.m |
5 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15 cm thick well rammed, watered and consolidated etc. complete complying with standard specification. | 6678.00 | Cu.m |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054