Inquiry NowConstruction Of Cement Concret, Bidhan Nagar - Tender Details
Explore tender information for Construction Of Cement Concret in Bidhan Nagar, including eligibility, deadlines, and bid specifics.
SUNDARBAN AFFAIRS DEPARTMENT
Bidhan Nagar, West Bengal, India
NTID 39161105
- Opening Date : Mon 24th February, 2025
- Closing Date : Thu 20th February, 2025
- ₹ 12429780.00
- NTID 39161105
Construction Of Cement Concrete Road From Land Of Najibul Sheik To Pirtala Math In Mouza - Mastikari And Padmerhaat , G. P. - Dakshin - Barasat, Block - Joynagar - I
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
248596.00 -
Document Cost
1000.00 -
Estimated Cost
12429780.00
BOQ Items Total Items : 35 | Total Qty : 22796859.1
# | Item | Quantity | Units |
---|---|---|---|
1 | Earthwork from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile. | 1303.50 | M3 |
2 | Extra rate over Item Nos.1.01 for all kinds of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres. | 260.70 | M3 |
3 | Extra rate over Item Nos.1.01 for all kinds of soil for every additional lift of 1.50 metre or part thereof beyond the initial lift of 1.50 metre. | 260.70 | M3 |
4 | Earthwork in excavation In all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land, including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, NB :- Measurement to be taken on the basis of stack / prepost work section measurement after deduction of void as per norms . no extra payment will be made for stacking . A) Beyond 500 metre and upto 1.00 Km | 372.40 | M3 |
5 | B) Beyond 1.00 km. and upto 2.00 Km | 93.10 | M3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054