ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Cc Road In Ary, Rewari - Tender Details
Explore tender information for Construction Of Cc Road In Ary in Rewari, including eligibility, deadlines, and bid specifics.
Haryana Government
Rewari, Haryana, India
NTID 38795663
- Opening Date : Wed 15th January, 2025
- Closing Date : Tue 14th January, 2025
- ₹ 1539981.00
- NTID 38795663
Construction Of Cc Road In Arya Nagar Ward No 10 Mc Rewari
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
30800.00 -
Document Cost
1000.00 -
Estimated Cost
1539981.00
BOQ Items Total Items : 7 | Total Qty : 3146.821
# | Item | Quantity | Units |
---|---|---|---|
1 | HSR Item 13.29.2-Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works HSR Rate(Rs.) 83.00 Through Rate | 50.000 | KG |
2 | HSR Item 5.23.2-Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) HSR Rate(Rs.) 1149.00 Through Rate | 244.781 | CUM |
3 | HSR Item 17.22.2-Water Bound Macadam Gr I 2. Water Bound Macadam Grading I with screening Type A Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications HSR Rate(Rs.) 1225.00 Through Rate | 163.187 | CUM |
4 | HSR Item 21.93.1-Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 1. Type:- Extra Heavy Duty Set (EHD-35) 560MM Clear Opening HSR Rate(Rs.) 1155.00 Through Rate | 7.000 | EACH |
5 | HSR Item 17.5.3-Compacting Original Ground 3. Compaction of Earthwork Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications HSR Rate(Rs.) 7.00 Through Rate | 2147.200 | SQM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054