ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Construction Of Car Parking Sh, Kolkata - Tender Details
Explore tender information for Construction Of Car Parking Sh in Kolkata, including eligibility, deadlines, and bid specifics.
KOLKATA PORT TRUST
Kolkata, West Bengal, India
NTID 39409152
Opening Date : Thu 13th March, 2025
Closing Date : Wed 12th March, 2025
- ₹ 3305677.00
- NTID 39409152
Construction Of Car Parking Shed At Western Side Of Subhash Bhavan
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
66120.00 -
Document Cost
1770.00 -
Estimated Cost
3305677.00
BOQ Items Total Items : 27 | Total Qty : 2777.75
# | Item | Quantity | Units |
---|---|---|---|
1 | Dismantle all types of Masonry excepting cement concrete plain or reinforced, stacking serviceable Materials at site &removing the rubbish as directed within a lead of 75 Mtr in ground floor including roof. | 10.00 | Cum |
2 | Dismantle all types of plain cement concrete works up to 150 mm thick stacking serviceable Materials at site andremoving rubbish as directed within a lead of 75 Metre in ground floor including roof. | 8.00 | Cum |
3 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars. Ground floor. | 1.00 | Cum |
4 | Earth work in excavation of the foundation tranches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing spreading or stacking the spoils within a lead of 75Mtr as directed. The Item including necessary trimming the sides of tranches, levelling, dressing and ramming the bottom, bailing out water etc. as required complete. Depth of excavation not exceeding 1500 mm. | 40.00 | Cum |
5 | Earth work in filling in foundation trenches or plinth with good earth obtained from excavation of foundation in layers not exceeding 150mm including watering and ramming etc. layer by layer complete. (Payment to be Made on the basis of the Measurement of finish quality of work). | 16.00 | Cum |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054