ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Boundary Wall , Awantipora - Tender Details
Explore tender information for Construction Of Boundary Wall in Awantipora, including eligibility, deadlines, and bid specifics.
Islamic University of Science and Technology
Awantipora, Jammu and Kashmir, India
NTID 38841137
- Opening Date : Mon 27th January, 2025
- Closing Date : Sat 25th January, 2025
- ₹ 5403654.00
- NTID 38841137
Construction Of Boundary Wall By Way Of Brick Work At City Office Bemina, Srinagar.
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
108073.00 -
Document Cost
3500.00 -
Estimated Cost
5403654.00
BOQ Items Total Items : 16 | Total Qty : 6571.261
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 388.010 | Cum |
2 | Extra rates for quantities of works executed : In or under water and/ or liquid mud, including pumping out water as required The extra percentage rate is applicable in respect of each item but limited to quantities of work executed in these difficult conditions. The unit, namely, metre depth, to be considered for payment, shall be the depth measured from the subsoil water level upto the centre of gravity of the quantity executed in difficult conditions. The depth shall be reckoned correct to 0.1 metre, 0.05 metre or more shall be taken as 0.1 metre and less than 0.05metre ignored | 296.380 | per metre depth |
3 | Providing and Laying nominal size Stone Soling (90 mm to 45 mm) including cost of stones and preparation of surface using quarry stones. Complete item including material and labours. | 112.390 | Cum |
4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 37.240 | Cum |
5 | Extra for laying concrete in or underwater and/or liquid mud including cost of pumping or bailing out water and removing slush etc. complete. Note:- The quantity will be calculated by multiplying the depth measured from the sub-soil water level up to centre of gravity of concrete under subsoil water level with quantity of concrete in cum executed under sub-soil water. The depth of centre of gravity shall be reckoned correct to 0.1m, 0.05m or more shall be taken as 0.1m and less than 0.05m ignored | 114.150 | Cum per metre depth |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054