ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Construction Of Approach And A, Jaunpur - Tender Details
Explore tender information for Construction Of Approach And A in Jaunpur, including eligibility, deadlines, and bid specifics.
Uttar Pradesh State Bridge Corporation Limited
Jaunpur, Uttar Pradesh, India
NTID 39353835
Opening Date : Tue 25th February, 2025
Closing Date : Tue 25th February, 2025
- ₹ 6838940.00
- NTID 39353835
Construction Of Approach And Additional Approach Over River Basuhi On Between Nagesara And Purelala Village At Nagesara Ghat In Distt Jaunpur
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
603497.00 -
Document Cost
11800.00 -
Estimated Cost
6838940.00
BOQ Items Total Items : 9 | Total Qty : 33567.2
# | Item | Quantity | Units |
---|---|---|---|
1 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. | 15742.00 | cum |
2 | Cement Treated Sub Base (GSB with 2% cement) | ||
3 | Providing, laying and spreading Material on a prepared sub grade, adding the designed quantity of cement to the spread Material, mixing in place with rotavator, grading with the motor grader and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base. | 550.00 | cum |
4 | Cement Treated Base (WMM stablise with 4% cement) | ||
5 | Providing, laying and spreading Material on a prepared sub grade, adding the designed quantity of cement to the spread Material, mixing in place with rotavator, grading with the motor grader and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base. | 525.20 | cum |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054