ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Additional Flo, Ganderbal - Tender Details
Explore tender information for Construction Of Additional Flo in Ganderbal, including eligibility, deadlines, and bid specifics.
National Projects Construction Corporation Limited
Ganderbal, Jammu and Kashmir, India
NTID 38939313
- Opening Date : Fri 24th January, 2025
- Closing Date : Thu 23rd January, 2025
- ₹ 75809000.00
- NTID 38939313
Construction Of Additional Floor For G Plus 1 Load Bearing Wall Type Structure At Central University Of Kashmir At District Ganderbal, Kashmir (j And K)
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1517000.00 -
Document Cost
11800.00 -
Estimated Cost
75809000.00
BOQ Items Total Items : 26 | Total Qty : 449832.186
# | Item | Quantity | Units |
---|---|---|---|
1 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard settingof concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately.In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. The minimum Cement content considered in this item is 330kg/cum. All works above plinth level upto floor V level | 1006.490 | Cum |
2 | Add for using extra cement in the items of design mix over and above the specified cement content therein. | 332.000 | Quintal |
3 | Centering and shuttering including strutting, propping etc. and removal of form for, All works above plinth level upto floor V level. | ||
4 | Lintels, beams, plinth beams, girders, bressumers and cantilevers. | 7495.000 | Sqm |
5 | Columns, pillars, piers, abutments, posts, and struts. | 1930.250 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054