- Home
- >
- Tender
- >
- Karnataka Tender
- >
- Department of RITES Ltd.
- >
NTID 39808133
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Construction Of Additional Cla, Chamrajnagar - Tender Details
RITES Ltd.
Chamrajnagar, Karnataka, India
NTID 39808133
- Opening Date : Tue 8th April, 2025
- Closing Date : Mon 7th April, 2025
- ₹ 15368000.00
- NTID 39808133
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
307000.00 -
Document Cost
8260.00 -
Estimated Cost
15368000.00
BOQ Items Total Items : 231 | Total Qty : 22629.17
# | Item | Quantity | Units |
---|---|---|---|
1 | Schedule 1 - Part A - KPWD SR 2024-25 Items - Civil | ||
2 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. | 23.74 | Cum |
3 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work | ||
4 | In all kinds of soils Depth upto 3 m-In all kinds of soils- ( Consider 70% of total excavation) | 73.75 | Cum |
5 | Depth exceeding 1.5 m, but not exceeding 3 m ( 30% of Total excavation Qty) | 31.61 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054