ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Additional Cla, Ranchi - Tender Details
Explore tender information for Construction Of Additional Cla in Ranchi, including eligibility, deadlines, and bid specifics.
Ministry Of Human Resources Department
Ranchi, Jharkhand, India
NTID 39000485
- Opening Date : Sat 25th January, 2025
- Closing Date : Fri 24th January, 2025
- ₹ 0.00
- NTID 39000485
Construction Of Additional Class Room In 06 Existing Elementary, Secondary And Higher Secondary Schools Located In Giridih District Of North Chotanagpur Division Of Jharkhand.
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
257000.00 -
Document Cost
10000.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 70 | Total Qty : 43194.498
# | Item | Quantity | Units |
---|---|---|---|
1 | Earthwork in excavation in foundation trenches in ordinary soil (vide classfication of soil item - A) and disposal of excavated earth a obtained to a distance up to 50M including all lifts with leveling ramming the foundation trenches removing roots of trees shurbs all complete as per approved design and per building specification and direction of E/I. | 557.280 | M3 |
2 | Extra for earth work in hard soil as per specification and direction of E/I. (vide classfication of soil item - B) | 557.280 | M3 |
3 | Earth filling in foundation trenches and plinth in layers not exceeding 150 mm. thick well watered, rammed, fully compacted and fine dressed with earth obtained after cutting within a lead of 50 M. and lift of 1.5 M all complete as per building specification and direction of E/l (Mode of measurement compacted volume). | 323.032 | M3 |
4 | Providing coarse clean sand in filling in foundation trenches or in plinth including thick with all leads and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/I. (Mode of measurement compacted voume) | 370.602 | M3 |
5 | Providing designation 75 A one brick flat soling joints fill with local sand including cost of waterinf taxes, foyalty all complete as per building specification and direction of E/I. | 312.948 | M2 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054