ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Construction Of Additional Cla, Kokrajhar - Tender Details
Explore tender information for Construction Of Additional Cla in Kokrajhar, including eligibility, deadlines, and bid specifics.
Bodoland Territorial Council
Kokrajhar, Assam, India
NTID 39435161
Opening Date : Wed 12th March, 2025
Closing Date : Wed 12th March, 2025
- ₹ 5690960.00
- NTID 39435161
Construction Of Additional Class Room At Bagribari Uchha Madhyamik Vidyalaya, Kokrajhar Under Samagra Shiksha, Assam For The Year 2024-25.
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
113820.00 -
Document Cost
1710.00 -
Estimated Cost
5690960.00
BOQ Items Total Items : 56 | Total Qty : 21503.5
# | Item | Quantity | Units |
---|---|---|---|
1 | 2.1 Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge 2.1.1 All kinds of soil | 154.89 | cum |
2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 109.40 | cum |
3 | 4.1 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 4.1.5 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 8.87 | cum |
4 | Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 12.5mm nominal size derived from natural sources) | 14.68 | sqm |
5 | 2.35 Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) : 2.35.3 Treatment of soil under existing floors using chemical emul sion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: 2.35.3.1 With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 154.35 | sqm |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054