ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Construction Of 10 Nos Toilet , Gumla - Tender Details
Explore tender information for Construction Of 10 Nos Toilet in Gumla, including eligibility, deadlines, and bid specifics.
WATER RESOURCES DEPARTMENT
Gumla, Jharkhand, India
NTID 39268937
Opening Date : Sat 15th February, 2025
Closing Date : Thu 13th February, 2025
- ₹ 1216295.00
- NTID 39268937
Construction Of 10 Nos Toilet At St Residantial Boys High School, Kandapat,dumri,gumla
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
24400.00 -
Document Cost
2500.00 -
Estimated Cost
1216295.00
BOQ Items Total Items : 97 | Total Qty : 2227353.41
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work in excavation in foundation trenches in foundation in ordinary soil (vide classification of soil -A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts levelling ramming the foundation trenches, removing, roots of trees shurbs all complete as per approved design building specification and direction of E/l. + Extra for earth work in hard soil as per approved design building specification and direction of E/l.(Vide classification of soil item -B) | 32.00 | M |
2 | Providing coarse clean sand filling in foundation trenches or in plinth including ramming and watering in layersnot exceeding 150 mm thick all leads and lift including cost of all materials, labour.royality and taxes all completeas per building specification and direction of E/I | 7.93 | M |
3 | providing designation 75 A one brick flat soling in foundation, joints filled with local sand including cost of watering, taxes,royality all complete asper building specification and direction of E/I | 51.05 | M |
4 | Providing and laying in position ceemnt concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 | 5.85 | M |
5 | Providing and laying in position specified grade of reinforced cement excluding the cost of centering shuttering finishing and reinforcement - All work up to plinth level , 1:1.5:3 | 2.89 | M |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054