ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of 3024 Nos Of F, Raniganj - Tender Details
Explore tender information for Construction Of 3024 Nos Of F in Raniganj, including eligibility, deadlines, and bid specifics.
HOUSING DIRECTORATE
Raniganj, West Bengal, India
NTID 39045662
- Opening Date : Mon 10th February, 2025
- Closing Date : Fri 7th February, 2025
- ₹ 58681571.00
- NTID 39045662
Construction Of 3024 Nos. Of Flats Along With Other Amenities At Bijoynagar And Daskeary, (j.l.no.-02) Mouza In Raniganj Area, Asansol, Dist-p Burdwan R.c.f.a. Project At Raniganj For Rehabilitation. -for Unfinished Works Of Bijoynagar C Block.
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1000000.00 -
Document Cost
400.00 -
Estimated Cost
58681571.00
BOQ Items Total Items : 439 | Total Qty : 219573.569
# | Item | Quantity | Units |
---|---|---|---|
1 | Building Works Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 77.080 | %m3 |
2 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches | 327.320 | m2 |
3 | Batch Mixed concrete of M 25 Grade with well Graded stone chips of 20 mm nominal size containing designed quantity of cement per Cu. M of Wet concrete produced in computerised batching plant under controlled condition using approved super plasticizer designing concrete mix following I.S 10262 and I.S. 456 transporting the mix with agitation in transit mixer to work site depositing the mix on a platform erected for the purpose at required level of concreting and then placing the mix in its final location of form work compacting and curing the same complete as per specification and direction of the Engineer-in charge including hire charges of computerised batching plant, transit mixer with all accessories vibrators etc. inclusive of all other incidental charges in this connection complete but excluding cost of hire charge of platform and its supporting staging which would be paid through separate item. Consumption of cement will not be less than 300 Kg of cement per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. [Cement to be supplied by Deptt, if Cement is supplied by agency then item rate to be deduced as per Format A of Annexure I] [with Batching Plant & transit mixer] In Ground Floor& Foundation. [Pakur Variety] | 81.570 | m3 |
4 | 1st floor | 36.970 | m3 |
5 | 2nd floor | 36.970 | m3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054