Construction Of 01 No 12x88 , Jhansi - Tender Details
Rajya Krishi Utpadam Mandi Parishad
Jhansi, Uttar Pradesh, India
NTID 39820350
- Opening Date : Wed 16th April, 2025
- Closing Date : Wed 16th April, 2025
- ₹ 0.00
- NTID 39820350
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1120000.00 -
Document Cost
29500.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 50 | Total Qty : 41778104.92
# | Item | Quantity | Units |
---|---|---|---|
1 | Boring and casting of 30 cm dia piles of double under reamed of 75 cm dia bulb and 3.50 meter deep below ground level consisting 4 nos. 12 mm dia main bar and 6mm rings @ 25cm c/c filled with C.C. in 3:1.5:1 with 2 cm gauge stone grit, coarse sand & cement including supply of all materials, labour, T&P etc. required for proper completion of the work. Analysis. | 46.00 | Nos. |
2 | Boring and casting of 20 cm dia piles of single under reamed of 75 cm dia bulb and 3.50 meter deep below ground level consisting 4 nos. 12 mm dia main bar and 6mm rings @ 25cm c/c filled with C.C. in 3:1.5:1 with 2 cm gauge stone grit, coarse sand & cement including supply of all materials, labour, T&P etc. required for proper completion of the work. Analysis. | 98.00 | Nos. |
3 | Excavation in foundation in black cotton soil including lift upto 1.5m and lead upto 30m also including filling, watering and ramming of excavated earth into the trenches with use of special tools and plants such as pick axes and sabbals etc. required for proper completion of the work. S.I.No.257 | 227.45 | Cum. |
4 | Cement concrete with 4cm gauge approved stone ballast, coarse sand, cement in the proportion 8:4:1 including supply of all materials, labour, T&P etc. required for proper completion of the work. S.I.No.281 | 215.57 | Cum. |
5 | Earth filling in plinth including supply of necessary quantity of earth from 5 K.M. outside market yard including watering, dressing etc. also including supply of all materials, labour, T&P etc. required for proper completion of the work. Analysis. | 357.82 | Cum. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054