Construction Of 3 No Entrance , Kanpur - Tender Details
Explore tender information for Construction Of 3 No Entrance in Kanpur, including eligibility, deadlines, and bid specifics.
Uttar Pradesh State Industrial Development Corporation Limited
Kanpur, Uttar Pradesh, India
NTID 39399565
Opening Date : Fri 28th February, 2025
Closing Date : Thu 27th February, 2025
- ₹ 39102486.00
- NTID 39399565
Construction Of 3 No Entrance Gate Ev Charging Center Bus Shelter Repairing And Maintenance Of Administrative Building Staff Quarter Pump House Boundary Wall Including Horticulture Land Scaping Rain Water Harvesting Etc Under Aiim Ii At Rooma Knp.
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
922819.00 -
Document Cost
8850.00 -
Estimated Cost
39102486.00
BOQ Items Total Items : 314 | Total Qty : 182716.13
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. All kinds of soil | 212.43 | CuM |
2 | Earth -work in exacavation in foundation in ordinary soil, loam, clay or sand including lift upto 1.5m & lead upto 30m including filling watering & ramming of excavated earth in to the trunches or in to the space between the building & the side of foundation tranches or in to the plinth removal & disposal of surplus earth as directed by engineer in charge upto a distance of 30m from the foundation trenches. (Excluding Royalty) | 81.46 | CuM |
3 | CARRIAGE OF MATERIALS By Mechanical Transport including loading, unloading and stacking of Earth up to 1 km | 83.97 | CuM |
4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 128.46 | CuM |
5 | Providing and laying Cement concrete 1:4:8 (1 cement : 4coarse sand : 8 graded stone ballast 40 mm nominal size) including supply of all materials.labour and T&P etc. required for proper completion of the work and curing complete. also including cost of formwork in foundation | 34.56 | CuM |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054