ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of 1000 Mts Capac, Chennai - Tender Details
Explore tender information for Construction Of 1000 Mts Capac in Chennai, including eligibility, deadlines, and bid specifics.
Registrar Cooperative Societies
Chennai, Tamil Nadu, India
NTID 38910796
- Opening Date : Mon 27th January, 2025
- Closing Date : Mon 27th January, 2025
- ₹ 0.00
- NTID 38910796
Construction Of 1000 Mts Capacity Godown At Eraviputhur Village Agastheeswaram Taluk Kaniyakumari District
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
90000.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 197 | Total Qty : 16650.97
# | Item | Quantity | Units |
---|---|---|---|
1 | SCHEDULE - A : CONSTRUCTION OF 1000 MTs CAPACITY GODOWN | ||
2 | Earth work excavation for foundation in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, gravel, stoney earth and earth mixed with 50% fair sized boulders and hard gravelly soil inclusive of shoring, strutting and baling out water wherever necessary including refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and an initial lift of 2m and clearing and levelling the site etc., complete complying with standard specifications. | 306.00 | 1 M (One Cubic Metre) |
3 | Supply and filling in foundation with SAND in layers not exceeding 150mm thick, well watering , ramming and consolidation etc., complete | 35.00 | 1 M (One Cubic Metre) |
4 | Plain Cement Concrete 1:4:8 (One cement, four sand and eight hard broken stone) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers | 23.00 | 1 M (One Cubic Metre) |
5 | Reinforced Cement Concrete 1:1-1/2:3 (One Cement, One and a half sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforced grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054