- Home
- >
- Tender
- >
- West Bengal Tender
- >
- Department of NORTH BENGAL DEVELOPMENT DEPARTMENT
- >
NTID 39764915
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Construction Of 1200 Mm Dia Hu, COOCHBEHAR - Tender Details
NORTH BENGAL DEVELOPMENT DEPARTMENT
COOCHBEHAR, West Bengal, India
NTID 39764915
- Opening Date : Wed 9th April, 2025
- Closing Date : Mon 7th April, 2025
- ₹ 7467753.00
- NTID 39764915
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
149355.00 -
Document Cost
1000.00 -
Estimated Cost
7467753.00
BOQ Items Total Items : 19 | Total Qty : 9766.2639
# | Item | Quantity | Units |
---|---|---|---|
1 | Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202 for Rural Roads of MORD. (c) Above 900 mm dia Hume pipe | 75.00 | Mtr |
2 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . (a) Depth upto 3 m. iv) Without pumping out water and shoring | 1015.20 | m3 |
3 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1 for Rural Roads of MORD. (pre work post work measurement) b) Carriage upto total lead of 3.00 km | 1500.00 | Cum |
4 | Construction of Sub Base using Local Materials: Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (iv) For Construction of Sub Base by compacting River Bed Materials. | 251.10 | m3 |
5 | Earthwork in filling in foundation trenches with good earth in layers not exceeding 15cm. including watering and ramming layer by layer complete with earth obtained from excavation of foundation or from fresh excavation of land arranged by Department within a lead of 150 m. | 338.40 | m3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054