ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Construction Of 50 M t Cold S, Burdwan - Tender Details
Explore tender information for Construction Of 50 M t Cold S in Burdwan, including eligibility, deadlines, and bid specifics.
ANIMAL RESOURCES DEVELOPMENT DEPARTMENT
Burdwan, West Bengal, India
NTID 39437438
Opening Date : Mon 17th March, 2025
Closing Date : Sat 15th March, 2025
- ₹ 4789387.00
- NTID 39437438
Construction Of 50 M.t. Cold Store At Nawabhat, Fagupur, Purba Burdwan-713104 Under West Bengal Livestock Development Corporation Limited For The Year 2024-25.
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
95788.00 -
Document Cost
Refer Documents -
Estimated Cost
4789387.00
BOQ Items Total Items : 32 | Total Qty : 6335.377
# | Item | Quantity | Units |
---|---|---|---|
1 | Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed. | 855.000 | Sqm |
2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. | ||
3 | (a) Depth of excavation not exceeding 1,500 mm. | 188.347 | Cum |
4 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) | ||
5 | (a) With earth obtained from excavation of foundation. | 131.841 | Cum |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054