ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Construction Of 6 Laboratory B, Chennai - Tender Details
Explore tender information for Construction Of 6 Laboratory B in Chennai, including eligibility, deadlines, and bid specifics.
HIGHER EDUCATION
Chennai, Tamil Nadu, India
NTID 39261959
Opening Date : Wed 19th February, 2025
Closing Date : Tue 18th February, 2025
- ₹ 36200000.00
- NTID 39261959
Construction Of 6 Laboratory Building With 2 Toilet Block In Government Polytechnic College At Chrompet, Chennai.
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
191000.00 -
Document Cost
Refer Documents -
Estimated Cost
36200000.00
BOQ Items Total Items : 120 | Total Qty : 34513.45
# | Item | Quantity | Units |
---|---|---|---|
1 | Earthwork excavation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting inclusive of shoring shuttering, baling out water wherever necessary refilling the foundation with excavated earth other than sandy soil in layers of not more than 15 cm thick layers well rammed and depositing the surplus earth within compound in places shown by the departmental officers with an initial lead of 10 metre and initial lift of 2 metre and clearing and leveling the site etc., complete complying with standard specification and as directed by the departmental officers. | 628.000 | cum |
2 | Refilling basement with excavated earth other than sand with an initial head lead of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed, watered and consolidated etc. complete complying with standard specification. | 120.000 | cum |
3 | Supplying and Filling in foundation and basement with filling M sand in layers of not more than 15cm thick well rammed watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 167.000 | cum |
4 | Supplying and Filling in foundation and basement with gravel in layers of not more than 15cm thick well rammed watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 140.000 | cum |
5 | Cement concrete 1:5:10 (one cement, five M sand and ten aggregate) using 40mm gauge hard broken blue granite stone jelly for foundation and basement including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete complying with standard specification and as directed by the departmental officers. | 153.000 | cum |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054