Construction Mini Coffee Proce, Jeypore - Tender Details
- Opening Date : Fri 28th March, 2025
- Closing Date : Wed 26th March, 2025
- ₹ 881599.00
- NTID 39770069
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 55 | Total Qty : 1438.46
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work in excavation of foundation in all kinds of soil including moorum, stony earth mixed with boulders (except sheet rocks and boulders requiring blasting) with all leads and lifts including dressing and leveling the bed and depositing the excavated earth at places away from work site with all leads and lifts including cost of all labour and T&P and dewatering if required for the works etc. complete as directed by the Engineer-in-charge. | 45.670 | cum |
2 | Supplying, filling in foundation and plinth with sand in 22.5 cm (9 ) thick layers including watering and ramming with cost, conveyance, royalties and taxes of sand with labour and T&P required for the work etc. complete (Measurement will betaken on finished compacted section only). | 15.000 | cum |
3 | C.C.( 1:3:6) in foundation and floors using 4cm (1 ) size HGCB metal with all labour,cess and T&P required for the work etc. complete in all respect. | 14.860 | cum |
4 | R.C.C. work M-20 grade using 20mm and 10mm size black hard crusher broken granite chips including hoisting lowering laying and centring shuttering and finishing the exposed surface smooth providing groves or beds wherever necessary including cost, conveyance, royalties and excluding GST and cost of all materials and labour with T & P required for the work etc. complete in all respect excluding the cost of M.S. Rods or Tor steel and binding wires and labour charge for bending binding and tying grills as directed by the Engineer in charge. | ||
5 | (a) Column base, frustum | 4.320 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054