Description
Construction And Maintenance Of Pwd Road To Podhachapar Bus Stand To Podhachapar Road In The District Of Bolangir Under Trip For The Year 2022-23
BOQ Items Total Items : 123 | Total Qty : 121142.44999999998
# | Item | Quantity | Units |
---|---|---|---|
1 | Clearing grass and removal of rubbish up to a distance of 50 mtr outside the periphery of the area and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness as per specification and as per the direction of Engineer -in charge. | 13080.00 | Cum |
2 | Dismantaling of of Brick / stone masonary in cement mortar above 3 mtr height for existing structures including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviciable materials and stacking the serviciable materials with all lifts and lead of 1000 m as per specification and as per the direction of Engineer-in-charge. | ||
3 | Brick / stone masonary | 7.20 | Cum |
4 | Cement Concrete | 4.80 | Cum |
5 | Reinforce Cement Concrete | 24.00 | Cum |
