Opening Date : Fri 28th February, 2025
Closing Date : Thu 27th February, 2025
- ₹ 873071.00
- NTID 39433403
Constructing Of Cement Concrete At Various Places In Ward No. 43 Sharif Colony
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 8 | Total Qty : 402.45
# | Item | Quantity | Units |
---|---|---|---|
1 | Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed. By Mechanical Means. | 118.6000 | M3 |
2 | Conveying materials obtained from road cutting including all lifts, laying in layers of 20cm. to 30cm. breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97% of standard proctor density for a lead of 300m. to 500m. inclusive, from the site of excavation to the site of deposition as directed. | 118.6000 | M3 |
3 | Raising the Existing manhole chamber with 23 cm thick brick work in CM 1 : 5 prop. In 30 cm concentrick cone including 12 mm thick cement plaster in CM 1 : 4 prop on both side complete.(As per rate analysis) | 15.0000 | No. |
4 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader / Paver on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401-- Plant Mix Method and Grading - III Material | 44.4750 | M3 |
5 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, , cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant/ Weigh batch mixer, transported to site with all leads and lifts, laid with a paver with electronic sensor /by suitable means as approved by Engineer-in-charge , compacting with vibratory roller, finishing, curing and including preparation of sub-grade surface if required etc. complete. | 44.4750 | M3 |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.