ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConst Of Wire Crate Head Weir , Nirmad - Tender Details
Explore tender information for Const Of Wire Crate Head Weir in Nirmad, including eligibility, deadlines, and bid specifics.
Irrigation And Public Health Department
Nirmad, Himachal Pradesh, India
NTID 39136897
- Opening Date : Mon 10th February, 2025
- Closing Date : Fri 7th February, 2025
- ₹ 2380344.00
- NTID 39136897
Const Of Wire Crate Head Weir, Const Of Rcc Channel 90 Mtrs., Const Of Breast Wall 15 Mtrs., And Earthwork For Diversion Of Stream And Removal Of Slips,debries
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
47607.00 -
Document Cost
500.00 -
Estimated Cost
2380344.00
BOQ Items Total Items : 12 | Total Qty : 3572.434
# | Item | Quantity | Units |
---|---|---|---|
1 | Excavation in foundation trenches etc. in all kinds of earth work such as spade work, pick work, jumper work saturated /un saturated soil blasting work and chiseling/wedging out of rocks where blasting work prohibited up to all depth and lifts including pumping and bailing out water where ever required stacking the excavated earth not more than 3mtrs.clear from the edge of excavation and then returning the stacked soil in 15cm.layers when required into the plinth sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated material within all leads and lifts, useful material available from excavation to be properly stacked and handed over free of cost to the department as per direction of the Engineer-in Charge. | 89.100 | Cum |
2 | Providing and laying cement concrete 1:5:10 (1cement: 5sand: 10 graded stone agg.40mm nominal size) and curing complete excluding cost of form work in foundation and plinth within all leads and lifts as per satisfaction and direction of Engineer-in-charge. | 163.740 | Cum |
3 | Providing Placing &Laying mild /tor steel reinforcement for RCC. work including bending, binding and placing in position complete up to floor two level including all leads and lifts.: a) Tor steel | 1732.250 | Kg. |
4 | Providing and laying cement concrete 1:1.5:3 (1cement:1.5 sand : 3graded stone aggregate 20mm nominal size)and curing complete excluding cost of form work and re-inforcement for reinforced concrete work in: | ||
5 | Foundations, footings, basis of columns & the like and mass concrete. | 14.850 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054