ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowClosing Of Pot Holes Rate Ho, NOWROZABAD - Tender Details
Explore tender information for Closing Of Pot Holes Rate Ho in NOWROZABAD, including eligibility, deadlines, and bid specifics.
South Eastern Coalfields Limited
NOWROZABAD, Madhya Pradesh, India
NTID 38858138
- Opening Date : Mon 20th January, 2025
- Closing Date : Sat 18th January, 2025
- ₹ 477622.00
- NTID 38858138
Closing Of Pot Holes / Rate Holes Due To Illegal Mining In Different Different Places At The Bank Of Johila River / Gajra Nallah At Pali Sub Area Of Johila Sub Area
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
6000.00 -
Document Cost
Refer Documents -
Estimated Cost
477622.00
BOQ Items Total Items : 5 | Total Qty : 2561.5
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil | 513.90 | cum |
2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 513.90 | cum |
3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 32.70 | cum |
4 | Excavating earth, filling earth in the empty cement bag, carriage manually earth filled bag upto the site and filling of the same in Rate holes/ Pot holes i/c. cost of empty cement bag as per instruction of Engineer-In-Charge. | 1500.00 | Bag |
5 | Total impact of GST for the purpose of CTC | 1.000 | Nos |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054