Tender for UTTAR PRADESH POWER TRANSMISSION CORPORATION LIMITED - NTID 30523362
UTTAR PRADESH POWER TRANSMISSION CORPORATION LIMITED
Jhansi, Uttar Pradesh, India
NTID 30523362
- Opening Date : Fri 10th February, 2023
- Closing Date : Thu 9th February, 2023
- ₹ 2716625.00
- NTID 30523362
Civil Work Related To Increasing Capacity From (2x20 1x40mva) To (2x40 1x20mva) At 132 Kv S/s Kalpi Distt. Jalaun (p.r. No. 1300010719/2023)
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
54000.00 -
Document Cost
1770.00 -
Estimated Cost
2716625.00
BOQ Items Total Items : 87 | Total Qty : 4030.842
# | Item | Quantity | Units |
---|---|---|---|
1 | Excavation in foundation in black cotton soil requiring the use of special T&P such as pickaxes, sabbals etc including lift upto 1.5m and lead upto 30m and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of the foundation. (CSI No. 4.07) | 89.428 | CuM |
2 | River Bed Fine Sand filling in plinth including supply of necessary quantity of fine sand from outside the UPPCL premises including watering, dressing etc. Rate to include cost of all materials, labour and T&P etc. required for proper completion of work.(CSI No. 4.05) | 27.190 | CuM |
3 | Clearing jungle including uprooting of rank vegetations,grass, bush, wood, trees and saplings of girth upto 30cm measured at a height of 1.0m above ground level and removal of rubbish upto a distance of 50m outside the periphery of UPPCL area cleared. (CSI No. 4.08) | 180.000 | SqM |
4 | Earth filling under floors and/or corporation area including cost of earth obtained with in 8 km distance outside corporation area including all taxes (if any) and its carriage including watering, ramming in 20 cm layers and dressing of earth etc. all complete. (CSI No. 4.10) | 69.300 | CuM |
5 | Concrete with 4cm gauge stone ballast, coarse sand & cement in proportion of 12:6:1 in foundations &under floors including supply of all materials, labour and tools and plants etc. required for proper completion. (CSI No. 5.02) | 25.919 | CuM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane