Carbon Wrapping Of Column And , Nagpur - Tender Details
Explore tender information for Carbon Wrapping Of Column And in Nagpur, including eligibility, deadlines, and bid specifics.
MINISTRY OF MINES
Nagpur, Maharashtra, India
NTID 39436583
Opening Date : Mon 3rd March, 2025
Closing Date : Fri 28th February, 2025
- ₹ 0.00
- NTID 39436583
Carbon Wrapping Of Column And Beams Of Overhead Water Tank At Khanij Vihar Colony, Hazaripahad Road,mecl,nagpur
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
6900.00 -
Document Cost
1000.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 2 | Total Qty : 110
# | Item | Quantity | Units |
---|---|---|---|
1 | Carbon Wrapping | ||
2 | Strengthening structural elements by providing and fixing CARBON FIBER (Make Sika or BASF or FOSROC) surface preparation: Grinding concrete substrate, cleaning it with wire brush removing oil, laitance if present, rounding sharp edges to min 25mm radius etc complete. Profiling: providing and applying compatible Mbrace primer on prepared substrate , filling the holes and uneven surface with high strength epoxy putty etc. complete if required . Wrapping: Providing and applying first coat of saturant, cutting the carbon fiber sheet to size, wrapping the fiber sheet to structural element at desired orientation using tamping roller to avoid any air voids etc complete. Sand pasting : Providing and applying second coat of saturant after min. 12hrs, rectify air voids if any paste the rive sand on it to make surface rough to take any further finishes (Mode of measurement: Per Sq.mt of Mbrace CF 400 sheet applied and not surface area of concrete application & Quantity will be measured including wastage) The rate includes all type of material, application, equipment & scaffolding etc complete . Rate is applicable for all height & level. | 110.000 | Sq.mt |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054