ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowBudget Work 2024 25 20 Perc Up, Changanassery - Tender Details
Explore tender information for Budget Work 2024 25 20 Perc Up in Changanassery, including eligibility, deadlines, and bid specifics.
Public Works Department
Changanassery, Kerala, India
NTID 38901840
- Opening Date : Mon 20th January, 2025
- Closing Date : Sat 18th January, 2025
- ₹ 1055749.00
- NTID 38901840
Budget Work 2024 25 20 Perc Upgradation Work Providing Bm Bc To Puthuppally Vennimala Road Ch 0 600 To 5 450 Km And Other Allied Works On Ch 0 000 5 450 Part Ts Reconstruction Of Damaged Culvert At 0 850 In Puthuppally Vennimala Road
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
26394.00 -
Document Cost
2760.00 -
Estimated Cost
1055749.00
BOQ Items Total Items : 16 | Total Qty : 214.072
# | Item | Quantity | Units |
---|---|---|---|
1 | CULVERT RECONSTRUCTION | ||
2 | 2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres <br> Cement Concrete Grade M-15 & M-20 - By Mechanical Means <br> | 2.400 | cum |
3 | 2.4.4.D:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Dry rubble masonry | 5.400 | cum |
4 | 3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m) | 80.560 | cum |
5 | OD172629/2024-2025:Dry rubble packing for foundation and superstructure | 14.060 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054