ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowBeautification Work Of Pokhar , MAU - Tender Details
Explore tender information for Beautification Work Of Pokhar in MAU, including eligibility, deadlines, and bid specifics.
Directorate of Local Bodies UP
MAU, Uttar Pradesh, India
NTID 38899515
- Opening Date : Fri 31st January, 2025
- Closing Date : Thu 30th January, 2025
- ₹ 3473242.00
- NTID 38899515
Beautification Work Of Pokhar Located In Mau Ramnagar.
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
70000.00 -
Document Cost
4100.00 -
Estimated Cost
3473242.00
BOQ Items Total Items : 32 | Total Qty : 13043.02
# | Item | Quantity | Units |
---|---|---|---|
1 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the slide of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 M. from the foundation trenches. | 4.80 | cum |
2 | Concrete with 4 cm. guage Stone ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundation and under floors including supply of all materials, labour Tools & plants etc. required for proper completion of the work. Colomn | 0.40 | cum |
3 | R.C.C. work in cement, app. coarse sand & 2cm gauge app. stone grits in proportion 1:1.5:3 in Colomn excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and including supply of all materials, labours, T&P etc. reqd. for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra as per SI no. 284 new item. Colomn angle Fixing | 5.46 | cum |
4 | M.S. (tor steel or plain) in plain work such as RCC or R.B. work including bending for proper shape and including supply of steel & its wastage, bends, hooks and authorised overlaping shall be measured and including cost of binding wire | 428.61 | kg |
5 | Scraping old white or colour wash including disposal of refuse as directed by the Engineer-in-charge within a distance of 60 metre (200 feet). Wall | 2493.20 | sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054