- Home
- >
- Tender
- >
- Goa Tender
- >
- Department of GOA HOUSING BOARD
- >
NTID 39790289
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Balance Work Of Construction O, Goa - Tender Details
- Opening Date : Wed 9th April, 2025
- Closing Date : Tue 8th April, 2025
- ₹ 4495637.00
- NTID 39790289
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
89913.00 -
Document Cost
4000.00 -
Estimated Cost
4495637.00
BOQ Items Total Items : 48 | Total Qty : 8235.212
# | Item | Quantity | Units |
---|---|---|---|
1 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m.All types of Ordinary rock including all types of laterite rock, blasting prohibited | 144.400 | M3 |
2 | Extra for additional depth of 1.5 m or part there off in earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift from 1.5m and above , disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : All types of ordinary rockincluding all types of laterite rock, blasting prohibited . | 16.000 | M3 |
3 | Providing & laying cement concrete 1:3:6 (1 cement: 3 coarse sand: 6 graded granitic or basaltic stone aggregate. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in:a) All works upto plinth level | 2.400 | M3 |
4 | Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge. | 129.680 | M3 |
5 | Supplying and filling in plinth under floors, trenches including watering ramming consolidating, dressing, complete. : Sand | 55.730 | M3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054