ANDAMAN LAKSHADWEEP HARBOUR WORKS
Lakshadweep, Lakshadweep, India
NTID 39424413
Opening Date : Fri 28th February, 2025
Closing Date : Thu 27th February, 2025
- ₹ 0.00
- NTID 39424413
Attending Major Repair And Servicing Of 400kva Transformer At Ce And A (alhw) Office Complex, Mohanpura, Sri Vijaya Puram.
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
10000.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 18 | Total Qty : 919
# | Item | Quantity | Units |
---|---|---|---|
1 | Disconnecting carefully electrical connection from both HT/LT (primary & secondary sides of the transformer, keeping them at safe side and taking out the transformer outdoor type of capacity 400 KVA, 11 KV/ 0.433 KV, step up / step down any make for carrying out complete overhauling which shall comprise of the following, as per the direction of EIC ,including cost of all materials required, cost of all labour charges, transportation charges, cost of all taxes and duties, GST etc., complete. | 1.00 | Job |
2 | Lifting the transformer from site, transporting & handling, up to workshop and opening top cover of the transformer by unscrewing nuts, bolts, washers etc, including disconnecting core assembly from HT/LT bushing and lifting the same gently and taking out from the shell (container/ body) of the transformer. | ||
3 | Draning out transformer oil from the above said transformer in the suitable capacity of container/ drums and keeping it in safe custody for reuse. | ||
4 | Cleaning the transformer body from inside, removing deposited dirt/ sludge/ foreign particles etc, from the bottom/ body of the transformer and drying up the shell from inside before refilling of the transformer oil etc. | ||
5 | Cleaning and washing thoroughly core and windings of the transformer by hosing down with clean dry oil (without moisture) conforming to IS 335/1983, removing deposited dirt/ sluge/ foreign particles from the windings/ core, thorough inspection of windings, providing insulations to leads and terminals, heating/ drying/ baking complete carefully and thoroughly inside the heating chamber at suitable temperature to obtain requested value of insulation resistance etc., |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.