Tender for Military Engineer Services - NTID 29858519
Military Engineer Services
Dinjan, Assam, India
NTID 29858519
- Opening Date : Sat 17th December, 2022
- Closing Date : Thu 15th December, 2022
- ₹ 3700000.00
- NTID 29858519
Area Development And Allied Infra Near Rhino Gate In Jorhat Mil Stn
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
74000.00 -
Document Cost
500.00 -
Estimated Cost
3700000.00
BOQ Items Total Items : 19 | Total Qty : 7453
# | Item | Quantity | Units |
---|---|---|---|
1 | Surface dressing not exceeding 15 cm deep in soft/ loose soil complete all as specified and as directed. | 2500.00 | Sqm |
2 | Bringing approved earth (as approved by Garrison Engineer) from sources outside defence land including cost of land, royality if any, transportation, taxes etc for filling including raising earth spreading in layers not exc 30 cm thick in each layer watering,compection with 8 to 12 tone power roller and finished to required size and shape etc any high/depth from existing ground level complete all as specification and as directed. Note :(i). Earth required for the item, shall be supplied by contractor, from out side MOD land at his own arrangment. (ii). All cost of procurment of earth including cost of transportation, royalties, taxes etc. shall be deemed to be included in the unit rate quoted by the contractor.(iii). With referance to clause 3.6 of MES SSR Part-II (2020) on serial page No. 21 it is clarified that measurement of the above item shall be of finished embarkment/treverse of filled earth after consolidation and 10% deduction shall be made from measured and calculated volume to allow for increase in bulk. | 2500.00 | Cum |
3 | Removing excavated material exceeding 1.50 km but not exceeding 5.0 km and depositing where directed at a level complete all as specified and as directed. | 435.00 | CUM |
4 | Excavating in trenches not exceeding 1.5 m wide and not exceeding 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. or for cable laying or water supply pipes lines etc or not exceeding 10 sqm on plan and not exceeding 1.5 m in depth and getting out in soft/ loose soil complete all as specified and as directed. | 100.00 | Cum |
5 | M & L for hardcore (broken stone or boulders) of gauge not exceeding 63 mm, deposited, spread and levelled in layers not exceeding 15 cm thick, watered and rammed to a true surface complete all as specified and as directed. | 12.00 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane