ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowAnnual Maintenance Of Building, Kavaratti - Tender Details
Explore tender information for Annual Maintenance Of Building in Kavaratti, including eligibility, deadlines, and bid specifics.
ANDAMAN LAKSHADWEEP HARBOUR WORKS
Kavaratti, Lakshadweep, India
NTID 38860469
- Opening Date : Tue 21st January, 2025
- Closing Date : Mon 20th January, 2025
- ₹ 1552182.00
- NTID 38860469
Annual Maintenance Of Buildings At Kavaratti For Bthe Year 2024-2025
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
31043.00 -
Document Cost
Refer Documents -
Estimated Cost
1552182.00
BOQ Items Total Items : 33 | Total Qty : 2962.75
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work excavation in all soils and filling in foundation etc. in 150 mm layers including cost of all labour charges, tools etc. complete. | 5 | Cum |
2 | Providing and laying CC 1:4:8 mix using 40 mm granite chips for repair works of cycle shed, varandah etc. including cost of all labour charges, cement, sand, tools, transportation of materials to the work site within a lead of 3 kms but excluding cost of granite chips providing shuttering and centering wherever necessary etc. complete. | 4 | Cum |
3 | Providing and laying R.C.C. 1:2:4 (one cement, two sand and 4 granite chips 20mm down size) for repair works of sunshade slab, cover slab of soak pit, drainage pit etc. including cost of all labour charges, cement, sand, tools, transportation of materials to the work site within a lead of 3 kms providing shuttering and centering wherever necessary but excluding cost of granite chips which will be supplied by the department, etc. complete. | 2 | Cum |
4 | Providing form work for RCC works including cost of all labour charges, tools, cost of all materials, transportation of materials to the work site within a lead of 3 kms etc. complete. | 45 | Sqm |
5 | Fabrication and placing of m.s. rod grills for the RCC works including cutting, bending, tying and placing cost of binding wire etc. including cost of all labour charges, tools, cost of all steel, fabrication charges, transportation of materials etc. complete. | 2 | Qtl |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054