Annual Basisi Patch Repair Wor, Digod - Tender Details
Explore tender information for Annual Basisi Patch Repair Wor in Digod, including eligibility, deadlines, and bid specifics.
Public Works Department
Digod, Rajasthan, India
NTID 39261637
Opening Date : Tue 18th February, 2025
Closing Date : Mon 17th February, 2025
- ₹ 9000000.00
- NTID 39261637
Annual Basisi Patch Repair Work On Various Roads In Sub Dn Digod
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
180000.00 -
Document Cost
1000.00 -
Estimated Cost
9000000.00
BOQ Items Total Items : 2 | Total Qty : 69874
# | Item | Quantity | Units |
---|---|---|---|
1 | Filling pot holes and patch repair with WBM as per table 400-7 to Water Bound Macadam specification including spreading in uniform thickness, hand packing, rolling with power roller 8-10 tonnes, in stages to proper grade and camber, applying and brooming requisite type of screening (Table 400-8) / binding Materials to fill up the interstices of coarse aggregates, watering (with water browser) and rolling, making necessary earthen bund to protect edges, lighting, guarding, barricading and maintenance of Driversion etc. [MoRTH specifications : Clause 404]. | 9159.00 | Sqm |
2 | Filling pot-holes and patch repairs with open-graded premix surfacing, 20mm thick compacted with bitumen binder VG10 @14.60 kg/10 sqm and aggregate in Hot Mix Plant, transporting the mixed Material with tipper and laying manually to the required level and grade, rolling with power roller, 8-10 tonne, removal of all failed Material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot-holes with hot bituminous Material as per Clause 511, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 including cost of tack coat and excluding cost of seal coat with lead for mix of Material 1 km. (MoRTH specification : Clause 3004.2) | 60715.00 | Sqm |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054