Facebook
Description

Air Conditioning Work At New Sdm Office Building, City Centre, Durgapur-713216, Dist. Paschim Bardhaman.

Tendering Authority: ASANSOL DURGAPUR DEVELOPMENT AUTHORITY

India, West Bengal, Bardhaman

NTID

29343556

Last Date For Submission

01 Nov, 2022

Closing Date

01 Nov, 2022

BOQ Items Total Items : 5 | Total Qty : 450
# Item Quantity Units
1 Supply & installation at the work site of 1.5 (one point five) TR capacity 3 star split air conditioner with upto 4 mtr. copper pipe (double) line and cable between ID & OD units all complete with S &F of bracket for installation of OD unit. Make: Carrier (Indus Cx / equivalent) / Equivalent from Hitachi/ Daikin/ Blue Star. Rate obtained from PL of Carrier, Dt. 21.01.2022. 10 No.
2 Supply & installation at the work site of 2 (two) TR capacity 3 star split air conditioner with upto 4 mtr. copper pipe (double) line and cable between ID & OD units all complete with S &F of bracket for installation of OD unit. Make: Carrier (Indus Cx / equivalent) / Equivalent from Hitachi /Daikin/Blue Star. Rate obtained from PL of Carrier, Dt. 21.01.2022. 18 No.
3 Extra for additional length of copper pipeline & cabling of requisite size exceeding 4 mtr. between ID & OD units of air conditioners. Item includes S & F of all requisite copper pipes & electric cables as per requirement with proper insulation & dressing. ADDA maint appvd. rate. 420 RM
4 G S T As applicable @ 12% on total work done value ( SL NO. - 1 to 3) 1.0000 Nos.
5 Labour Welfare Cess @ 1% on total work done value including G S T ( SL NO. - 1 to 4) 1.0000 Nos.
Tender InquiryInquiry