Dedicated Freight Corridor Corporation Of India Limited 13 Days Left
NTID 30682376
Description : Construction Of Rub / Lhs Of Having Size 1x7.0x4.0m Of Approx. 25m Length Under Dfc Portion (by Pre-cast Segmental Method And Cast In-situ) At Vapi Rob At Ir Km 172/16-18 (dfc Chainage 13+523.289) Between Vapi-bhagwada Railway Station Of Virar - Surat Section Of Mumbai Division O...
South East Central Railway 13 Days Left
NTID 30560872
Description : (1) Bilaspur Division:- Elimination Of Level Crossing No.bk-94 In Chandia Yard By Provision Of Limited Width Rob. (2) Bilaspur Division: Construction Of Nhs Under Bypass Line & Up Lead Line To Bcn Depot On Extension Of Sanctioned Nhs Under Construction At Tarbahar Lc No.366b At B...
South Central Railway 6 Days Left
NTID 30560793
Description : 1.dkj- Mugr Section- Telecom Arrangements In Connection With Proposed Construction Of (rub) In Lieu Of Lc _ No.6kk At Km: 19/2 -3 Between Dkj-mugr Section By Box Pushing Method. 2.dkj- Mugr Section- Telecom Arrangements In Connection With Proposed Construction Of (rub) In Lieu Of...