Tamil Nadu Electricity Board 14 Days Left
NTID 28320901
Mtps-i-chp-ii-removal Of Coal Choke In The Coal Transfer Chutes In Scr Machines I & Ii And Conveyors 12a1, 12b1, 12a2, 12b2, 13, 14, 15a, 15b, 16, 17, 18 And Bfd 10a, 10b, 11a, 11b & 12a, 12b Chutes For A Period Of 90 Days From The Date Of Commencement Of Work. (phase-i For The Y...
Tamil Nadu Electricity Board 14 Days Left
NTID 28320897
Mtps-i – Chp-ii – Routine / Preventive Maintenance Works In Conveyors 12a1, 12b1, 12a2, 12b2, 15a, 15b, Conveyor-18 For A Length Of 1200 Mtrs. And Bfds 10a, 10b, Tt1b, Flap Gate Floor, Tt-2 And Cleaning Of All The Equipments In Conveyors Both Ends For A Period Of 120 Days Day...
Tamil Nadu Electricity Board 14 Days Left
NTID 28320896
Mtps I- Chp-ii- Quenching Of Fire On Coal Heaps In The Coal Yard Using Either By Sprinkler System Or By Fire Hydrant To Suppress The Spontaneous Combustion Of Coal And Smelting Coal While Stacking & Reclaiming Dozing Operation And Maintenance Of Sprinkler Water Pipeline Etc. At C...
Tamil Nadu Electricity Board 15 Days Left
NTID 28320894
Mtps-i – Chp-i - Carrying Out Fabrication And Cold Vulcanizing Of Joint & Patch Vulcanizing In 1400mm, 1600mm, 1800mm Width Conveyor Belts And Rubber Lagging Of Various Size Conveyor Pulleys In Pcr/chp I For A Period Of 120 Days From The Date Of Commencement Of Work. (phase I F...
Tamil Nadu Electricity Board 14 Days Left
NTID 28320893
Mtps- I - O&ahs Ahph-i -routine & Preventive Maintenance Works And Cleaning Works In The Ash Slurry Pumps, High Pressure Water Pumps, Low Pressure Water Pumps, Flush Water Pumps, Seal Water Pumps, Sump Pumps, Cable Trench Pump, Ash Slurry Sumps, Related Pipe Lines And Valves In A...